ProjectConnect  
ProjectConnect currently holds 1061 supply opportunities that you can register your company's interest against. Career Planning - The Key to Achieving Success in Your Career - Click here for more information 6 Sep 2010 - Latest ProjectConnect News Update - Click Here
ProjectConnect Homepage HOME

REGISTER FOR SUPPLY OPPORTUNITIES
-
Current Projects Available for Gorgon Project
Back To Main Project >> Click the sub-project of interest below:
' Gorgon - Downstream Contracts
' Gorgon - Downstream Pre Assembly
' Gorgon - Downstream Procurement LNG Plant
' Gorgon - Downstream Procurement Offsite Facilities
' Gorgon - Drilling and Completions
' Gorgon - General Registrations
' Gorgon - LNG and Condensate Storage Tanks
' Gorgon - LNG Jetty and Marine Structures
' Gorgon - MEG (Mono Ethylene Glycol) Plant
' Gorgon - Operations
' Gorgon - Subsea Equipment and Operations Support
' Gorgon - Upstream Facilities
-
Project Name : Gorgon - Subsea Equipment and Operations Support
Description :
GE Oil & Gas is a world leader in advanced technology equipment and services for all segments of the oil and gas industry, from drilling and production, LNG, pipelines and storage to industrial power generation, refining and petrochemicals, and also provide pipeline integrity solutions, including inspection and data management. As part of the 'Innovation Now' customer focus and commitment, GE Oil & Gas leverages technological innovation from other GE businesses, such as aviation and healthcare, to continuously improve oil and gas industry performance and productivity. GE Oil & Gas employs more than 12,000 people worldwide and operates in over 100 countries.

GE Oil & Gas has been awarded a frame agreement by Chevron Australia Pty Ltd, to supply subsea equipment and support services for the upstream section of the Gorgon Project at Barrow Island off the North-western coast of Australia, over a period of five years.

GE Oil & Gas is a leader in the supply of long offset subsea control systems to facilitate subsea-to-beach field developments and is supplying the following scope for the Gorgon project: manifolds, pipeline termination structures, pipeline end terminations, trees with subsea control modules, wellheads, production control systems, systems integration testing, installation and operations support.

GE Oil & Gas is looking for suitable suppliers to deliver equipment packages. Suppliers interested in providing the listed goods will need to demonstrate they have appropriate quality and safety processes in place, are competitive and capable of on-time delivery, and have a compliance culture.

Goods & Services required for this project.
* Items underlined and shown in blue provide additional information on packages, tenderers or the successful supplier
PDF PDF icons provide additional information on packages. To view information click on the PDF icon.  If required you can download Acrobat Reader by  Clicking Here
REF NO. FULL PACKAGE DESCRIPTION REGISTRATION CLOSES FULL PACKAGE COMPONENTS OF PACKAGE TENDERERS / SUPPLIER
MANFAB001
Detail engineering and delivery of ROV operated protection hatches in GRP Glass fiber Reinforced PolyesterUsed for dropped objects protection of equipment on thesubsea structures typical 50 kJ impact energyTypical size 1300 x 2300 mm weight 100 kgRequired Units 100
GRP roof hatches View description
15/3/2010
MANFAB002
Fabrication (welding and machining) and surface protection of steel hatches, for evacuation of air and water in foundation compartments on subsea structures during offshore installation. Typical hatch size diam. 1600 mm, weight 1400 kg. Required units approx. 40.
Mudmat hatches View description
15/3/2010
MANFAB003
Isolation valve with flanged end connections in steel or plastic materials, for temporary use during offshore installation of subsea structures. Operation of the valve shall be by ROV according to ISO 13628. Typical size 3”, pressure rating min. 15 bar.Required Units approx. 80.
Suction and Grouting valves View description
15/3/2010
MANFAB004
Design, fabrication and surface protection of suction panel for temporary useduring offshore installation of subsea structures. The suction panel will include structural frame, front panel with ROV grab bar,3” isolation valves, 3” pipe manifold, manometers, marking and a stab receptaclefor connection of a hose from a suction pump (suction pumps and hose not part of suction panel).Pressure rating min. 15 bar, service sea water, size approx.1500 x 1200 x 1000 mm, weight 450 kg.Required Units 10.
Suction panel View description
15/3/2010
MANFAB005
Design and fabrication of subsea connectors for temporary useduring offshore installation of subsea structuresPressure rating min 15 bar typical size 3 with straight through flow service sea water and groutRequired units approx 50 Female stab receptacles 2 5 Male stabs
Suction stab, receptacle and cap View description
15/3/2010
MANFAB006
Design and fabrication of subsea connectors for temporary use during offshore installation of subsea structures. Pressure rating min. 15 bar, typical size 3” with straight through flow,service sea water and grout.Required units approx. 50 Female stab receptacles, 2-5 Male stabs
Grouting stab, receptacle and cap View description
15/3/2010
MANFAB007
Fabrication (welding and machining) and surface protection of a mechanical jack assembly used for leveling of the subsea structures after subsea installation. Size approx. 1500 x 700 x 700 mm, weight 500 kg. Required Units 6
Levelling jacks View description
15/3/2010
MANPROP001
Instrument for measurement of inclination of structuresduring offshore installation.Required units 12.
Inclination indicator View description
15/3/2010
MANPROP002
Rubber plug for flooding of structural profilesduring offshore installation.2000 units required.
Split Rubber grommets View description
15/3/2010
MANFAB008
Fabrication of Gorgon manifolds, pipeline termination structure, foundations and lifting frames. Approximate total weight 2,650 Tonnes.
Fabrication Package No. 1 View description
15/4/2010
MANFAB009
Fabrication of Jansz manifolds, pipeline termination structure, foundations and lifting frames. Approximate total weight 1,350 Tonnes.
Fabrication Package No. 2 View description
15/4/2010
MANFAB010
Fabrication of Gorgon and Jansz midline pipeline termination structure, foundations and larger pig launchers / receivers. Approximate total weight 2,600 Tonnes.
Fabrication Package No. 3 View description
15/4/2010
MANFAB011
Fabrication of Gorgon and Jansz pipeline end terminations. Approximate total weight 961 Tonnes.
Fabrication Package No. 4 View description
15/4/2010
MANFAB012
Fabrication of Gorgon and Jansz small bore pig launchers / receivers. Approximate total weight 54 Tonnes.
Fabrication Package No. 5 View description
15/4/2010
MANFAB013
Fabrication of Gorgon and Jansz central distribution units and foundations. Approximate total weight 140 Tonnes.
Fabrication Package No. 6 View description
15/4/2010
MANFAB014
Prefabrication of kit required to complete all well jumpers and pipeline spools. Approximate total weight 2,810 Tonnes.
Fabrication Package No. 7 View description
15/4/2010
MANPROP003
Supply of Clad Piping; 1.5D Bends, 5D Induction Bends, Concentric Reducers, End Caps, Equal Tees, Pipe, Reducing Tees, Sweepolets and WN Flanges. Material LTCS 415, NA 625, LTCS 450, MWP 450, DNV SMLS 415S, DNV SMLS 450S, DNV MWP 450 and Nickel Alloy 625 - UNS N06625. Approximate total weight 650 Tonnes.
Clad Piping View description
15/4/2010
PCSSUB001 Hydraulic Power Unit (HPU) Download PDF (24.87 kb)
7/8/2010
 


[ Terms of Use ] [ Privacy Policy ]