The Macedon gas field is located in offshore WA-42-P; formerly Retention Lease WA-12-R. The field is situated in the Northern Carnarvon Basin, approximately 100 km west of Onslow and 40 km north of Exmouth, Western Australia.
The license for WA-42-P is held jointly by BHP Billiton Petroleum (71.43%) and Apache Energy Australia (28.57%). BHP Billiton Petroleum, as Operator of offshore permit area WA-42-P, proposes to develop the Macedon gas field in to produce domestic gas for use by Western Australian consumers.
The Macedon Project includes the following components
-
4 initial subsea wells, manifold, 20” subsea wet gas pipeline and umbilical to shore
-
Onshore Gas Plant (OGP) for dehydration, dew pointing, water and condensate treatment and sales gas compression
-
Sales gas pipeline from OGP to Dampier to Bunbury Natural Gas Pipeline tie-in
-
Onshore infrastructure including Construction Camp and Access Road to site
CURRENT PROJECT ACTIVITY:
FEED is currently underway with Clough Australia. Clough is supported by subcontractors Mustang Engineering and JP Kenny for the onshore and offshore scopes, respectively.
This website www.projectconnect.com.au provides a listing of the packages to be procured on the Macedon Project. The listing will be updated throughout the Definition and Execution Phases.
The Industry Capability Network (ICNWA) is assisting the project identify Australian industry capability. To contact ICNWA, please call (+61 8) 9365 7623.